Capacitor Planning Question:
The maximum output of a system in a given period is called?
Answer:
1. The economic order quantity
2. The master production schedule
3. The production efficiency
4. The designed capacity
5. The breakeven point
The designed capacity
2. The master production schedule
3. The production efficiency
4. The designed capacity
5. The breakeven point
The designed capacity